Home Forums Show & Tell Grebe Synchrophase MU-1 late version

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #6504
    Rob Uthe
    Forum Participant

    This is the next project I am working on. I have already fixed the chain drives and pulleys for the tuning assembly. There was a previous replacement of a bypass capacitor, probably done quite a long time ago.

    #6507
    Rob Uthe
    Forum Participant

    The insides.

    • This reply was modified 3 years, 2 months ago by Rob Uthe.
Viewing 2 posts - 1 through 2 (of 2 total)
  • You must be logged in to reply to this topic.